Official operator sequence

How to Process a Bid: Steps 1–75

Follow the red numbers in order. Every number and action below matches the red number attached to that control in the estimator, from 1 — New Bid through 75 — Mark as Sent.

Before Step 1: Sign in with your assigned account and collect the latest solicitation, complete drawing set, searchable specifications, all addenda, customer bid forms, deadline, and submission instructions. These are preparation requirements, not separate red program numbers.
Estimator estimator action Manager reviewer/approver action Conditional only when the job requires it Automatic the program performs this work
  1. A. Start the bid · Step 1Estimator Start a new bidClick New Bid. Save any bid already open before replacing it.
  2. B. Load bid documents · Steps 2–4Conditional Upload the spec book or RFP first (optional auto-fill)Use a searchable PDF, DOC, DOCX, or TXT. Review and correct every value the program fills automatically.
  3. Estimator Upload the complete floor-plan setInclude cover/index sheets, legends, schedules, notes, floor plans, risers, details, and every low-voltage sheet.
  4. Estimator Upload every addendum and confirm none are missingInclude written addenda, revised sheets, and the deliberate “no addenda issued” answer when applicable.
  5. C. Complete Project Setup · Steps 5–24Estimator Enter or verify the project nameUse the official project name from the solicitation.
  6. Estimator Enter the exact bid due date and timeMatch the solicitation, including the time zone. This controls deadline warnings and saved-bid ordering.
  7. Estimator Enter the GC, agency, or clientUse the organization that will receive the bid.
  8. Estimator Select the estimator doing the takeoffChoose the person responsible for the quantities and bid record.
  9. Estimator Select the salesperson shown on the proposalVerify the displayed name, title, email, phone, and office.
  10. Estimator Choose the delivery methodSelect Plan-and-Spec or Design-Build as required by the job.
  11. Estimator Enter or verify the project locationUse the correct city and state because location affects wages, pricing, availability, and travel.
  12. Estimator Enter or verify the code jurisdictionConfirm the applicable code edition, local amendments, and authority having jurisdiction.
  13. Estimator Select the project typeChoose new construction, renovation, tenant improvement, addition, or the closest accurate option.
  14. Estimator Select every discipline included in the bidCorrect every auto-selected chip. Include all bid scope and remove only work clearly by others.
  15. Estimator Verify ceiling and floor-to-floor heightsKeep detected/default heights only when the drawings support them.
  16. Estimator Verify the plan sheet sizeChoose the actual drawing size to support scale and pathway calculations.
  17. Estimator List specific items that must be includedName unusual devices, owner requirements, alternates, or items needing special attention.
  18. Estimator Enter known quantities for an accuracy cross-checkUse confirmed schedule or manual counts only as a verification reference.
  19. Estimator Choose the correct wage typeMatch standard, prevailing-wage, Davis-Bacon, or other solicitation requirements.
  20. Conditional If prevailing wage applies, select the correct county/state/metroDo not continue with an unresolved wage jurisdiction.
  21. Estimator Choose the work shiftAccount for normal hours, nights, weekends, occupied work, and restricted access.
  22. Estimator Confirm whether this is transit or railroad workEnable the specialized cost and labor treatment when required.
  23. Estimator Confirm whether all divisions are self-performedTurn this on only when bidding as the prime and carrying all applicable divisions.
  24. Conditional Add the prior estimate when one existsUse a relevant prior bid for comparison and account for scope differences.
  25. D. Complete pricing setup · Steps 25–32Estimator Open pricing and cost settingsDo not accept hidden defaults without checking them.
  26. Estimator Choose the estimate depthSelect the level appropriate for the bid’s size, risk, and document quality.
  27. Estimator Choose the pricing tierMatch the material source quality and purchasing position available for this project.
  28. Estimator Verify the regional multiplierConfirm the selected region matches the actual project market.
  29. Estimator Apply the approved pricing preset or target marginUse the company-approved preset or a specifically authorized custom target.
  30. Estimator Verify every labor classification and rateCheck technicians, foremen, project management, engineering/programming, and all other displayed rates.
  31. Estimator Verify burden is included only when appropriateChoose deliberately and confirm the burden percentage.
  32. Estimator Verify material, labor, equipment, and subcontractor markupsThese values directly affect the customer price.
  33. E. Review and run analysis · Steps 33–40Estimator Continue to the pre-analysis reviewClick Next after all Project Setup warnings are resolved.
  34. Estimator Review the project summary and all uploaded file countsCompare the project, disciplines, formats, specifications, plans, and addenda to the solicitation.
  35. Estimator Review the estimated accuracy and fix weak inputs if neededReplace unreadable files, correct scale information, and resolve quality warnings before analysis.
  36. Estimator Add final estimator notes and special instructionsInclude scope priorities, exclusions to investigate, special counts, and customer directions.
  37. Estimator Save the draft before analysisConfirm the save succeeds so the setup can be recovered.
  38. Estimator Begin the AI analysisClick Begin Analysis and keep the bid tab open while processing runs.
  39. Estimator Answer every clarification using the plans and specificationsDo not guess. Check the source documents for every response.
  40. Estimator Continue only after every clarification is answeredResolve every required question before the program proceeds.
  41. F. Complete Travel & Costs · Steps 41–47Estimator Review the AI labor hours and crew recommendationCompare total hours, crew mix, and duration with field experience and project constraints.
  42. Estimator Choose travel/per diem or confirm this is a local jobUse No Per Diem — Local Job only when travel truly does not apply.
  43. Estimator Choose the scheduling method, crew, days, and mobilizationsUse By Techs or By Schedule and confirm the resulting person-days and trips are realistic.
  44. Estimator Enter and verify all travel costsInclude hotel, per diem, mileage, airfare, rental car, parking, tolls, and other actual costs.
  45. Estimator Enter permits, insurance, bonding, rentals, fuel, and bufferEnter zero only when the cost will not occur and avoid double-counting costs carried elsewhere.
  46. Estimator Review the complete travel and incidentals totalConfirm every included cost and the total added to the bid.
  47. Estimator Continue to Results; the required pin review opens firstClick View Results. Export remains blocked until the human pin review is complete.
  48. G. Complete the required pinned-plan review · Steps 48–54Estimator Read every pin warning and resolve every flagged itemAddress missing disciplines, near misses, look-alike symbols, CAD layers, scale limitations, Unit Mix, and unverified count sources.
  49. Estimator Open every drawing and flip through every sheetReview all relevant sheets, not only the first floor plan or legend.
  50. Estimator Use Find on Plan for every device typeInspect every colored dot against legends, schedules, risers, details, and expected totals.
  51. Estimator Add missed pins and remove false pins on the drawingAdd every missed device, remove every incorrect dot, and use alternate examples or exclusion zones when appropriate.
  52. Conditional Complete every required flagged-review or AI affirmationResolve the near-miss queue, approve applicable Unit Mix, and complete the exact on-plan affirmation when shown.
  53. Estimator Send the reviewed counts back to this bidClick Send counts to my bid inside the plan viewer and wait for confirmation.
  54. Estimator Confirm the pinned plans and generate the estimateClick Confirm pinned plans & generate to apply approved counts and unlock Results.
  55. H. Review Results & RFIs · Steps 55–66Estimator Review the final bid total and Bid Readiness scoreCompare the total and cost breakdown with the expected range. Follow every Bid Not Ready or Review Recommended instruction.
  56. Estimator Open Diagnostics and resolve every warning or sanity issueClear blocking math, scope, count, page, safety, and integrity findings.
  57. Estimator Review and edit every BOM quantity, price, and labor valueVerify count-source badges and all high-dollar or unverified lines; add missing scope and remove out-of-scope items.
  58. Estimator Review exclusions, assumptions, and clarificationsEdit every statement so it matches the actual scope and protects the company.
  59. Estimator Open Workbench and complete the pre-bid reviewReview Dashboard, Estimate Summary, Scope Validation, Risk/CO Exposure, Value Engineering, and Quote Comparison.
  60. Estimator Review, select, and export the required RFIsKeep only relevant questions, edit them for clarity, and obtain required answers before finalizing the bid.
  61. Manager Have the manager mark the bid as reviewedThe manager checks pins, scope, pricing, exclusions, RFIs, and Workbench notes, then records a useful review note.
  62. Estimator Check the ready-for-submission confirmationCheck it only after the displayed total, scope, documents, and manager review are correct.
  63. Manager Approve and submit the bid internallyComplete the internal approval before generating the customer deliverable.
  64. Estimator Generate the Full Proposal in WordGenerate it only from the approved final pricing and scope.
  65. Estimator Open the downloaded proposal and proof every page and dollarVerify customer/project names, total, alternates, addenda, scope, exclusions, credentials, review stamp, signatures, and attachments.
  66. Estimator Open Compliance after the proposal is approved and proofedDo not start submission until the approved proposal has been fully proofed.
  67. I. Compliance, approval, and delivery · Steps 67–75Estimator Complete every compliance filing that applies to this bidFinish applicable DBE/SBE/MBE, DAS, COI, bid-bond, subcontractor, and site-walk requirements.
  68. Estimator Open the Approval Chain tabUse the formal chain required for public, large, or high-risk bids.
  69. Manager Enter approvers and obtain every required approvalCorrect any rejection and resubmit until all required approvers show approved.
  70. Estimator Open the Send / DocuSign tabUse the delivery workflow only after compliance and approvals are complete.
  71. Estimator Confirm the To and CC recipientsMatch the solicitation and verify every email address.
  72. Estimator Proof the subject and complete email bodyInclude the correct project and bid identification without exposing internal notes.
  73. Estimator Choose the delivery methodSelect email, DocuSign, portal, or the exact method required by the customer.
  74. Estimator Open the email, attach the approved proposal, and send itAttach every required form, signature, bond, and supporting document; then deliver before the deadline.
  75. Estimator FINAL: after delivery succeeds, mark the bid as sentReturn to The Terminator, click Mark as Sent, save the final record, and retain delivery confirmation.

Do not send the bid if any of these are true